Wind Farm: Repair Windows
A wind park is not about the wind, it is about queues: several machines need fixing and there is one crane.

Running hours. Every turbine has an hour counter and a limit. Below the limit the failure risk is small, above it grows fast. A failure is worse than a planned repair: the machine stands for weeks, and undelivered energy is written as a penalty. So the operator's job is not 'fix what broke' but choosing what breaks next.
Repair window. The crane and the crew take a day and stop the neighbouring machines too: there is one working pad. The weather ignores the plan — at strong wind the lift is forbidden, the window moves, and the running hours keep ticking meanwhile.
The grid. In low-demand hours the dispatcher curtails output. A curtailed turbine earns no money but produces fatigue: spinning it at full pitch is not worth it, easier to limit or stop it.
Winter. Icing changes the blade profile: output drops, vibration grows. Blade heating saves the machine and eats the same kilowatts the grid pays for.
The score. MWh into the grid, losses from failures, crane hours wasted. The shift review tells the truth: the machine it was a pity to take down while alive was the one the park lost dead.